The
technical visit to Liantang/Heung Yuen Wai Boundary Control Point (蓮塘/香園圍囗岸) Construction Site which
organized by Hong Kong Chinese Institute of Engineers (HKCIE) (香港中國工程師學會) on 10th Oct 2017.
Hong Kong Society for Quality (HKSQ) was one of co-organizers. We took a photo in the Fanling Highway
Interchange construction site. I would
like to summarize today’s visit below.
Dr.
Aaron Tong (Chairman, HKCIE; Former Chairman, HKSQ) was this visit leader and
he briefed to us during travel.
HKCIE booked a big travel bus for this visit and we reached the location of Fanling Highway Interchange area.
We went
to the construction office first.
After
briefed safety rules and we wore the safety helmet and high visibility vest
before visit the site.
We went
up the steps and its capacity upto 20 people.
Minda
and I took a photo for memory.
The whole bridge of Fanling Highway Interchange was
showed.
Then we
took a group photo in front of the Mobile Lifting Frame equipment.
After
visit, we went back to the construction office and the engineer explained the
construction details to us.
The
segment was transported through the marine transport route from Dongguan to
Tuen Mun.
The most
difficult part was the segment erection in curve area. There are totally 1326 segment and had
installed 1285 segment.
The
curve part real photo was taken.
They
employed steel mold for the key segment and concreted the gap between key
segment and the spans of the viaduct.
The gap used for adjustment if any deviation within tolerance.
The
following photo showed the segments linked up other by temporary
pre-stressing.
I found
the construction map from CEDD to see the overall works.
The future paths from Hong Kong to Shenzhen were demonstrated.
After
the visit, Dr. Aaron Tong and I had lunch with Dr. Mickey Li (李榕) (Chairman, SZAQ) who visited
Hong Kong in these two days.
At the
end, I went back to CityU for the CityU EngD Society executive committee
meeting to arrange the coming activities.
Today is
a busy day for me!
Reference:
HKCIE - http://www.hkcie.org/
HKSQ - http://www.hksq.org/
CEDD Liantang/Heung
Yuen Wai Boundary Control Point and Associated Works - http://www.cedd.gov.hk/eng/projects/major/nt/5019gb.html
沒有留言: